CHARLOTTE, N.C.–(BUSINESS WIRE)–Dole Fresh Vegetables, a division of Dole plc (NYSE: DOLE) announced the implementation and activation of two General Electric 2.8-Megawatt wind turbines at its salad processing plant in Soledad, CA. Each Dole turbine generating power to the facility stands 499 feet tall at maximum height with rotor diameters of 417 feet. Whenever sufficient wind is present to rotate the blades, electrical energy is automatically generated, 24 hours per day, seven days per week